References - Test Runs
During nomal operation of train several physical measurements were detected and saved on a computer
- “Hamburg – Rostock” a test run on “Deutschen Doppelstock”. Aim of the test run was the measurement of pressure peaks caused by trains that were passing by.
- “Hamburg Metro” – This test run had the aim to detect the wrenching of carriage next to doors, to detect forces on door brackets, and door components, and to measure the movement of door leafs during service
- “Chemnitz Tram” measurement of forces on door drive unit
- “Railjet” - Austrian High speed train. Measurement of movement of ends of carriages against each other in order to get data for construction and dimensioning of gangways
- “Buenos Aires Metro” - Measurement of movement of ends of carriages against each other for finding track data of the metro line in order to dimension and construct a gangway for this special train